Construction Progress

Drake Avenue Apartments

Construction Progress

Updated December 4, 2024

 

11/25/2024 to 12/8/2024

  • Dirt moving
  • Dirt off haul from site
  • Import and placement of rock and other material onsite
  • Ongoing maintenance and replacement of erosion controls
  • Stocking of shoring material on site
  • Shoring wall installation – drilling, concrete, placing steel
 
 

12/9/2024 to 12/22/2024

  • Continuation of dirt moving
  • Continuation of dirt off haul from site
  • Import and placement of rock and other material onsite
  • Ongoing maintenance and replacement of erosion controls
  • Stocking of shoring material on site
  • Continuation of shoring wall installation – drilling, concrete, placing steel
 
 

12/23/2024 to 1/5/2025

  • Continuation of dirt moving
  • Continuation of dirt off haul from site
  • Import and placement of rock and other material onsite
  • Ongoing maintenance and replacement of erosion controls
  • Stocking of shoring material on site
  • Continuation of shoring wall installation – drilling, concrete, placing steel

 

Grading, dirt off haul, shoring walls require large tractors, trucks, drill rigs, concrete trucks, and other equipment. You can expect this equipment to be running for most of the day while these activities are ongoing.  When placed in reverse, trucks, tractors, and other equipment will beep which is an OSHA requirement and cannot be turned off.

 

This schedule is subject to change without notice.